These are conditions of approval for the permit once issued. Please read them carefully and if you have questions, please call. They will be required to be acknowledged when the permit is ready to be issued. These conditions will be placed on the permit as permanent record, as well.
| Deferred submittal of finalized engineered metal building frame plans and coordinated engineered foundation plans are required for review and approval, prior to footing placement inspection.
(view notes) | |
Verified on 10/8/2018 |
| As required, the property owner/applicant is responsible for obtaining the Ecology Construction Stormwater Permit. Douglas County does not administer the Construction Stormwater Permit. For information regarding Construction Stormwater Permits, review the information at www.ecy.wa.gov/programs/wq/stormwater/construction or contact the Storm Water Inspector at the Ecology Central Regional Office (509) 575-2490.
(view notes) | |
Verified on 3/19/2019 |
| The lot owner/contractor is responsible for taking measures necessary to prevent sediment from discharging on to the public right-of-way and/or adjacent properties.
(view notes) | |
Verified on 3/19/2019 |
| Parcel is located within Greater East Wenatchee Storm Water Utility Boundary. (DCC 19.40). Annual service charge shall be triggered upon permit issuance.
(view notes) | |
Verified on 3/19/2019 |
| Construction materials, equipment and debris shall not be stockpiled within the County right-of-way. This includes but is not limited to portable toilets and buidling/landscaping materials.
(view notes) | |
Verified on 3/19/2019 |
| Prior to occupancy, the engineer of record shall provide certification, including as-builts that document stormwater improvements have been completed in accordance with the plan submitted.
(view notes) | |
Verified on 3/18/2019 |
| Prior to occupancy, the applicant shall execute a private stormwater and maintenance agreement on forms provided by Douglas County. Contact County Stormwater staff for assistance.
(view notes) | |
Verified on 3/18/2019 |
| Implementation and update of temporary erosion control plan required until site is stabilized. Prior to construction, the stabilized entrance shall be in place. The construction entrance shall be maintained and refurbished as necessary to keep sediment from being tracked off site.
(view notes) | |
Verified on 3/19/2019 |
| Obtain and satisfy access permit (ACC). Curb-cut (Type 2 WSDOT Approach) and sidewalk adjacent to property is required.
(view notes) | |
Verified on 3/18/2019 |
| Obtain and satisfy ROW access/driveway permit prior to occupancy. Call for form inspection prior to pouring concrete. Final inspection prior to occupancy and after building construction.
(view notes) | |
Verified on 3/19/2019 |
| Applicant must contact The Colville Confederated Tribes and the WA State Department of Archaeology and Historical Preservation (DAHP) prior to any ground-work deeper than 80cm.
(view notes) | |
Verified on 3/19/2019 |
| FM Final Approval as of 10/1/2018 is ONLY for temporary occupancy of Unit G.
(view notes) | |
Verified on 3/19/2019 |
| Only Units B & E& F are granted Temporary Occupancy as of Fire Marshal approval until such time that the entire project in complete and Final Occupancy is granted on the entire project.
(view notes) | |
Verified on 3/19/2019 |
| All outdoor trash, garbage and refuse storage areas shall be screened on all sides from public view and, at a minimum, be enclosed with a five and one-half foot high wood, concrete or masonry wall, or sight obscuring fence and landscaping on all sides or as approved by the review authority.
Refuse storage areas shall be designed in accordance with the overall architectural theme of the associated building or structure.
(view notes) | |
Verified on 3/18/2019 |